Last night, Santos' LRP A Cold Box Project finished as a finalist in the 2016 PMI Project of the Year Awards. The project was Managed by Mr Mark Schefe of Santos, with our consultant Kurt Siu as the Project Engineer and Project Controller.

Aimed to replace the existing aluminium heat exchanger in Moomba's liquids recovery plant, the project was executed from 2014 to 2015 at Santos' Moomba Plant, ahead of schedule, under-budget and with zero harm.

The project was one of 3 finalists selected from over 80 project submissions.

Congratulations to Mark, Kurt and Santos for an outstanding achievement.

Other recent articles

Full blog index
December 01, 2021
December 01, 2021

Find out how GBA Projects can help your project perform.

Contact us.

Clients

  • 01-santos-logo.jpg
  • 02-bhp-logo-new.jpg
  • 03-hansen-logo.jpg
  • 04-sydney-water.jpg
  • 05-beach-energy.jpg
  • 05-kbr-logo.jpg
  • 06-aurecon-logo.jpg
  • 08-riot-tinto-logo.jpg
  • 09-sa-govt-logo.jpg
  • 10-spotless-logo.jpg
  • 11-built-environs-logo.jpg
  • 12-dyno-logo.jpg
  • 13-sa-power-logo.jpg
  • 14-incitec-logo.jpg
  • 15-electranet-logo.jpg